Pugliano Construction Website
  • Home
  • Infrastrusture
  • Commercial
  • Recreational
  • Institutional
  • Contact
Pugliano Construction Website
  • Home
  • Infrastrusture
  • Commercial
  • Recreational
  • Institutional
  • Contact

Superstructure Replacement of Pucketa Creek Bridge No.5

PCCI replaced the superstructure of the Pucketa Creek Bridge No.5 near intersection of Booker Street and SR366 in Plum Borough.  The existing 21”x48” concrete adjacent box beams were replaced with 17”x48” concrete adjacent box beams.  PCCI installed a temporary vehicular bridge and temporary roadway during construction. 

Copyright © 2025 Pugliano Construction Website - All Rights Reserved.


Powered by